This is general information, not legal, tax or accounting advice, and rules change. For anything official, check the ATO website (ato.gov.au) or your licensing authority, or ask your accountant.
What a quote is, and why it matters
A quote is your offer to do specific work for a specific price. Once the customer accepts it, it is usually the basis of your agreement, so it pays to be clear about what is included, what is not, and what happens if the job turns out different from what you expected.
A vague quote causes arguments later. A clear one takes a few extra minutes and saves hours of chasing and awkward phone calls.
What to put on every quote
Whatever your trade, a good quote has these things:
- Your business name, ABN and contact details, plus your licence number where your trade requires one.
- The customer's name and the address where the work will be done.
- The date, and a quote number so you can find it again.
- A short description of the job, including what is and is not included.
- Itemised lines for materials, labour, call-out or travel, and disposal, each with a quantity and a price.
- GST shown clearly: the GST amount and the total, or a note that you are not registered for GST.
- The total price.
- How long the quote is open for (an expiry date), because material prices change.
- Any deposit and your payment terms.
- How the customer accepts it.
How to price the job
Work out materials first, at what they cost you, then add a margin so you are paid for sourcing and carrying them. Add your labour: the hours the job will take, including travel and clean-up, at your hourly rate. Allow something for the unknowns. If you are never wrong about a job, you are probably leaving money on the table.
Resist pricing low to win the work. A customer who chooses you only on price is the one most likely to haggle on the invoice. Be consistent so that similar jobs get similar prices.
Say what is not included
Most disputes come from surprises. Write down the things you are assuming, such as clear access to the work area, the existing wiring or pipework being in reasonable condition, or the customer supplying a particular fixture. Say that anything outside the described work is a variation, priced and agreed before you do it.
Get GST right
If you are registered for GST, say whether your prices include GST or not, and show the GST amount and the total so nothing is a surprise. If you are not registered, do not add GST. A tool that works it out for you, line by line, avoids the most common mistakes.
A simple example
Here is how a plumber might set out a quote to replace a hot water unit. The prices are made up, to show the layout.
- Supply 250L electric hot water unit: 1 at $1,380.00 = $1,380.00
- Labour: 3 hours at $95.00 = $285.00
- Remove and dispose of old unit: 1 at $120.00 = $120.00
- Subtotal (before GST): $1,785.00
- GST (10%): $178.50
- Total (including GST): $1,963.50
- Valid for 30 days. A 20% deposit is due before work starts.
Send it quickly, then follow up
The first reasonable quote often wins the job, so send yours the same day if you can. Email it with a link the customer can open on their phone, and a PDF they can keep. If you hear nothing, a short, friendly follow-up after two or three days is normal and often all it takes.
Common questions
Many tradies use 14 to 30 days. Material prices and your own availability change, so an expiry date protects you from being held to an old price.
Once a customer accepts a quote it can form a contract, so treat it seriously. Rules differ by state and by trade, especially for larger residential building work, so check with your licensing authority or get advice for big jobs.
Many tradies quote standard jobs for free. Some charge for complex quotes that take real time, and take the fee off the price if the job goes ahead. Whatever you do, tell the customer before you start.